首页> 外文期刊>IEEE Transactions on Power Systems >Experience with joint AGC regulation
【24h】

Experience with joint AGC regulation

机译:有AGC联合监管经验

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Operating generators on automatic generation control (AGC) to follow load fluctuations has often been considered an unavoidable cost of doing business. However, several months of testing and more than two years of commercial operation have demonstrated that there can be significant benefits in transferring AGC regulation from three predominantly thermal-based utilities to a fourth predominantly hydro-based utility. This arrangement called joint AGC regulation successfully transfers high frequency regulation components for reduced fuel and maintenance costs and allows dynamic interchange scheduling to achieve flexible generation scheduling and improved economic dispatch. Successful implementation involved development of a joint AGC regulation control strategy and an evaluation of the tangible and intangible costs of providing AGC regulation.
机译:人们通常认为在自动发电控制(AGC)上运行发电机以跟随负载波动是经营中不可避免的成本。但是,几个月的测试和超过两年的商业运行证明,将AGC法规从三个主要以热能为基础的公用事业转变为第四个主要以水为基础的公用事业可以带来显着的收益。这种称为联合AGC调节的安排成功地转移了高频调节组件,从而降低了燃料和维护成本,并允许动态互换调度以实现灵活的发电调度和改善的经济调度。成功的实施包括制定联合的AGC法规控制策略,并对提供AGC法规的有形和无形成本进行评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号