...
首页> 外文期刊>IEEE Transactions on Power Systems >Assessing the competitiveness of demand-side bidding
【24h】

Assessing the competitiveness of demand-side bidding

机译:评估需求方招标的竞争力

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Demand-side bidding (DSB) provides a very flexible way of meetingnthe peak load in a production schedule. This paper demonstrates that, inna competitive electricity pool, DSB and other forms of flexiblengeneration can cause sharp and unwarranted price increases if thenproduction schedule is established on the basis of a minimization of thentotal production cost. Furthermore, the competitiveness of DSB isnartificially inflated if the load recovery periods which accompany thesenload reductions are not taken into consideration by the schedulingnprogram. It is argued that the actual value of DSB should be re-examinednin the light of these findings
机译:需求方投标(DSB)提供了一种非常灵活的方式来满足生产计划中的高峰负荷。本文表明,如果在最小化总生产成本的基础上制定生产计划,那么竞争激烈的电力库,DSB和其他形式的柔性发电会导致价格急剧上涨和不必要的上涨。此外,如果调度程序未考虑与减少负载相关的负载恢复时间,则DSB的竞争力会大大提高。有人认为应根据这些发现重新检查DSB的实际价值

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号