首页> 外文期刊>IEEE Transactions on Power Systems >Implementation of regulation as an ancillary service in Eskom and the use of Eskom Internal Web for this service
【24h】

Implementation of regulation as an ancillary service in Eskom and the use of Eskom Internal Web for this service

机译:在Eskom中将法规作为辅助服务实施,并为此服务使用Eskom内部Web

获取原文
获取原文并翻译 | 示例
           

摘要

This paper describes the implementation of regulation as a competitive ancillary service in Eskom. Eskom is presently forming a grid operator business, which is responsible for buying ancillary services and providing a reliable transmission network. The process of defining system performance criteria is described. The total costing of the regulation service to a single coal fired generator was done using EPRI cost calculations. The performance of an individual generator is calculated along the guidelines of NERC Policy 10, with no allowance for over-control. This performance criterion determines regulation performance and payment to the generator, Over 750 points are downloaded every 4 seconds from the energy management system. System performance and individual unit performance are calculated using standard packages. This information is then made available in near-real time on the Eskom Internal Web in graphic and tabular form. This allows each generator to continually see its actual performance.
机译:本文介绍了在Eskom中将法规作为一项竞争性辅助服务的实施情况。 Eskom目前正在组建电网运营商业务,该业务负责购买辅助服务并提供可靠的传输网络。描述了定义系统性能标准的过程。使用EPRI成本计算完成了对一台燃煤发电机的调节服务的总成本。单个发电机的性能是按照NERC政策10的准则计算的,没有过度控制的余地。该性能标准决定了调节性能和对发电机的付款。每4秒钟从能源管理系统下载750个积分。系统性能和单个单元性能是使用标准软件包计算的。然后,可以在Eskom内部网站上以图形和表格形式近乎实时地获得此信息。这使每个生成器都能不断查看其实际性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号