【24h】

Maintenance Risk

机译:维修风险

获取原文
获取原文并翻译 | 示例
       

摘要

Every power generation manager is a risk manager balancing maintenance spending, technical performance and un-availability to maximize the financial performance for their assets. To combat this risk, companies employ a variety of different management strategies. Solomon developed its maintenance risk methodology to both describe maintenance effectiveness and provide a means of communication throughout the organization, allowing for the greatest potential improvement. The methodology involves a visual framework that focuses on the risk of sub-optimization of the financial and technical performance of the asset rather than merely emphasizing one aspect such as reliability. Solomon's experience suggests that seldom do companies reduce risk by reducing severity (costs) first, primarily because there tends to be an underlying frequency (unavailability) issue that is driving the higher costs. Cutting costs would likely only exacerbate the problem. Unavailability should typically be addressed first, even at a higher, near-term cost to allow the generator the best chance of reducing costs in the long term.
机译:每位发电经理都是风险经理,负责平衡维护支出,技术性能和可用性,以最大程度地发挥其资产的财务绩效。为了应对这种风险,公司采用了各种不同的管理策略。所罗门开发了其维护风险方法,以描述维护有效性并提供整个组织内的沟通方式,从而最大程度地改善潜在风险。该方法涉及一个视觉框架,该框架关注于资产的财务和技术绩效进行次优化的风险,而不仅仅是强调可靠性等方面。所罗门的经验表明,公司很少通过首先降低严重性(成本)来降低风险,这主要是因为存在潜在的频率(不可用性)问题正在推动更高的成本。削减成本只会加剧这个问题。通常,首先应解决不可用问题,甚至以较高的近期成本来解决,以使发电机长期最大程度地降低成本。

著录项

  • 来源
    《Power Engineering》 |2009年第11期|p.16-18|共3页
  • 作者

    Eric D Tiffany;

  • 作者单位

    By Eric D. Tiffany, Solomon Associates;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 13:45:30

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号