首页> 外文期刊>Power Engineering >Supercritical Plants to Come Online in 2009
【24h】

Supercritical Plants to Come Online in 2009

机译:超临界工厂将于2009年上线

获取原文
获取原文并翻译 | 示例
           

摘要

Pulverized coal combustion comes in two flavors: subcritical and supercritical. Supercritical units operate at higher temperatures and pressures than subcritical units. Higher pressures increase turbine efficiency and power output so less coal is used to produce the same amount of electricity. It's too early to tell if the tide has turned again, but three supercritical coal plants will be ready to come online this year. We Energies' Elm Road Generating Station in Wisconsin is a two-unit, 1,230 MW supercritical plant that will burn bituminous coal. Construction on Xcel Energy's first new coal-fired project in 30 years began in January 2006. The new plant is scheduled to be completed in the fall. Comanche Unit 3 will burn low-sulphur Powder River Basin coal. Luminant's Oak Grove supercritical coal-fired power plant is under construction about 100 miles northwest of Houston. Comprising two supercritical lignite-faded power generation units, the plant will deliver 1,600 MW.
机译:煤粉燃烧有两种口味:亚临界和超临界。超临界单元比亚临界单元在更高的温度和压力下运行。较高的压力可提高涡轮效率和功率输出,因此使用更少的煤炭来产生相同的电量。现在判断潮流是否再次扭转还为时过早,但是今年将有三座超临界燃煤电厂准备投产。威斯康星州我们Energies的榆树路发电站是一台由两台机组组成的1,230 MW超临界电厂,将燃烧烟煤。 Xcel Energy在30年来的第一个新燃煤项目中的建设始于2006年1月。新工厂计划于秋天完工。科曼奇3号机组将燃烧低硫粉末河流域的煤炭。 Luminant的Oak Grove超临界燃煤电厂正在建设中,距休斯顿西北约100英里。该工厂将包括两台超临界褐煤褪色发电设备,将提供1,600兆瓦。

著录项

  • 来源
    《Power Engineering》 |2009年第7期|p.64-67|共4页
  • 作者

    Nancy Spring;

  • 作者单位

    By Nancy Spring, Senior Editor;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号