...
首页> 外文期刊>Port Engineering Management >Boskalis on court to complete Le Havre Port 2000 Dredging by end year
【24h】

Boskalis on court to complete Le Havre Port 2000 Dredging by end year

机译:Boskalis在法庭上将在年底前完成勒阿弗尔港2000年疏Dr工程

获取原文
获取原文并翻译 | 示例

摘要

Boskalis International is on track to complete is 9.8 million m3 Le Havre main dredging programme, for the first phase of the 'Port 2000' project, by the end of this year. Work on Le Havre's ambitious development programme began in the Autumn of 2001. The first phase will provide six new berths by 2006, followed by another six by 2010. The aim of the first phase is to double container traffic at North Europe's fourth largest port to 3m teu's over a four year timeframe. Dredging in the access channel and for a six mile long breakwater began in early 2002. The new facilities will receive the largest container vessels, of 7,000 teu's plus and with draughts of up to 14.5m. Port 2000's rationale centres on Le Havre's determination to position itself as a leading hub. This project will absorb around 75 % of the $600m investment scheme to upgrade and expand container and bulk facilities at Le Havre. Shoreside projects include three new logistics parks, adjacent to the container terminals and offering over half a million square feet of warehousing.
机译:Boskalis International有望在今年年底完成980万立方米的勒阿弗尔主要疏programme计划,该计划将用于“ Port 2000”项目的第一阶段。勒阿弗尔雄心勃勃的发展计划的工作始于2001年秋季。第一阶段将在2006年之前提供六个新泊位,然后到2010年再提供六个泊位。第一阶段的目标是使北欧第四大港口的集装箱运输量增加一倍,在四年的时间范围内达到300万标准箱。 2002年初开始疏通通道和长达6英里长的防波堤。新设施将接收最大集装箱船,载重7,000 teu船,吃水深度达1,450万。港口2000的理论依据是勒阿弗尔将自己定位为领先枢纽的决心。该项目将吸收6亿美元投资计划的约75%,以升级和扩展勒阿弗尔的集装箱和散货设施。岸边项目包括三个新的物流园区,毗邻集装箱码头,并提供超过50万平方英尺的仓储空间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号