...
首页> 外文期刊>Port Engineering Management >PD Ports completes first phase of container handling expansion plan
【24h】

PD Ports completes first phase of container handling expansion plan

机译:PD Ports完成了集装箱装卸扩展计划的第一阶段

获取原文
获取原文并翻译 | 示例
           

摘要

PD Ports has completed the first phase of its latest expansion programme to further develop its existing container terminal handling facilities at Teesport on the North East coast. This £2m investment involved the relocation of the Port's existing Vauxhall cars import compound to make some 1 0 acres of additional land available, directly behind the existing TCT2 container terminal facilities. This land has been freed up to accommodate an increase in container volumes, handled at Teesport.
机译:PD Ports已完成其最新扩展计划的第一阶段,以进一步发展其在东北海岸Teesport的现有集装箱码头装卸设施。这项200万英镑的投资涉及搬迁港口现有的Vauxhall汽车进口场馆,以在现有的TCT2集装箱码头设施后面直接增加1 0英亩的土地。这块土地已经腾出来,以容纳在Teesport处理的集装箱量的增加。

著录项

  • 来源
    《Port Engineering Management》 |2009年第5期|4|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号