...
首页> 外文期刊>Port Engineering Management >PCB dredging clean-up project begins on Lake Cochituate
【24h】

PCB dredging clean-up project begins on Lake Cochituate

机译:在Cochituate湖开始进行PCB疏ging清理项目

获取原文
获取原文并翻译 | 示例
           

摘要

A large ring of yellow buoys floats beside an Ellicott 300 SL 8" Swinging Drago dredge on the surface of Pegan Cove, marking the area where contractors have started removing sediment contaminated with PCBs, left by an accident at the Soldier Systems Centre 30 years ago.rnThe PCBs were found in the section of Lake Cochituate just to the east of Natick Labs. They came from a transformer explosion in 1 980 and got into the lake through a storm drain, said Jim Connolly, restoration programme manager for Natick Labs.
机译:大型的黄色浮标环在Pegan Cove的表面上的Ellicott 300 SL 8“摇摆式Drago挖泥机旁边漂浮,标志着承包商开始清除被PCB污染的沉积物的区域,这是30年前在士兵系统中心发生的事故。内蒂克实验室恢复计划经理吉姆·康诺利说,多氯联苯是在纳蒂克实验室以东的科奇图湖附近的部分中发现的,这些多氯联苯是在1 980年的一次变压器爆炸中通过雨水管道进入湖中的。

著录项

  • 来源
    《Port Engineering Management》 |2010年第4期|p.15|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号