...
首页> 外文期刊>Port Engineering Management >Jumbo completes installation for Anholt Offshore Wind Farm
【24h】

Jumbo completes installation for Anholt Offshore Wind Farm

机译:Jumbo完成安霍尔特海上风电场的安装

获取原文
获取原文并翻译 | 示例
           

摘要

Jumbo has successfully completed the TP-installation for the Anholt Offshore Wind Farm, off the Danish coast. Jumbo's DP2 Heavy Lift Vessel Jumbo Javelin installed the 111 TP's with a record-breaking installation rate of three TP's/day. The transport, installation, access to the TP's and grouting was done without any Lost Time Injuries (LTI=0). Once again Jumbo proved to have a very safe and efficient concept for the transport and installation of wind farm foundations with the use of only one free floating vessel on DP.
机译:Jumbo已成功完成了丹麦海岸安霍尔特海上风电场的TP安装。 Jumbo的DP2重型船Jumbo Javelin以111个TP的安装率创下了破纪录的安装率,即每天3 TP。 TP的运输,安装,访问和灌浆均已完成,没有任何时间损失(LTI = 0)。通过在DP上仅使用一艘自由浮动船,Jumbo再次被证明具有非常安全有效的概念,用于风电场基础的运输和安装。

著录项

  • 来源
    《Port Engineering Management》 |2012年第5期|p.35-36|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号