...
首页> 外文期刊>Port Engineering Management >Denso void filler aids corrosion prevention at Aberdeen Harbour
【24h】

Denso void filler aids corrosion prevention at Aberdeen Harbour

机译:电装空隙填料有助于阿伯丁港的腐蚀预防

获取原文
获取原文并翻译 | 示例

摘要

Aberdeen Harbour Board has recently completed the redevelopment of shipping berths at Torry Quay to meet the requirements of larger supply ships for the North Sea oilfields. The main contractor was McLaughlin & Harvey from Belfast. An integral part of the quay construction is formed by 10 m horizontal tie-bars which are cast into a structural concrete slab located 4 m below the finished surface. The bars protrude through the main quay wall formed by sheet piles and act as a fundamental component of the structure, thus requiring protection from the harshest marine conditions. In order to deter corrosion and help elongate the structures life span it was a design requirement to conceal the exposed ends within steel cylinder caps and provide an anti-corrosion void filler compatible with the cathodic protection system.
机译:阿伯丁港务局最近完成了托里码头船位的重建工作,以满足北海油田更大的补给船的需求。主要承包商是贝尔法斯特的McLaughlin&Harvey。码头结构的组成部分是由10 m的水平拉杆形成的,这些拉杆被浇铸到位于最终表面下方4 m的结构混凝土板中。横杆伸过由板桩形成的主码头壁,并作为结构的基本组成部分,因此需要保护以免受最恶劣的海洋条件的影响。为了防止腐蚀并帮助延长结构的使用寿命,设计要求是将裸露的端头隐藏在钢瓶盖内,并提供与阴极保护系统兼容的防腐蚀空隙填料。

著录项

  • 来源
    《Port Engineering Management》 |2012年第4期|p.8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号