...
首页> 外文期刊>Port Engineering Management >Van Oord orders DP2 cable-laying vessel for wind park construction
【24h】

Van Oord orders DP2 cable-laying vessel for wind park construction

机译:Van Oord订购用于风电场建设的DP2电缆敷设船

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Van Oord has ordered a new cable-laying vessel. The ship will be built at Damen Shipyards' wharf in Romania and will be completed at the end of 2014. The ship is intended for the installation of electricity cables for offshore wind parks. Van Oord is making preparations for the Gemini wind park project which will be constructed 60 kms to the north of Schiermonnikoog, one of the Dutch Wadden Islands. The cable-laying vessel will be deployed at that site, among many others.
机译:范·奥德(Van Oord)订购了一艘新的电缆敷设船。该船将在罗马尼亚达门船厂的码头建造,并将于2014年底完工。该船旨在为海上风电场安装电缆。 Van Oord正在为Gemini风电场项目做准备,该项目将在荷兰瓦登群岛之一的Schiermonnikoog北部60公里处建造。敷设电缆的船只将被部署在该地点。

著录项

  • 来源
    《Port Engineering Management》 |2013年第5期|30-30|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号