...
首页> 外文期刊>Port Engineering Management >Expansion at the Panama Canal continues
【24h】

Expansion at the Panama Canal continues

机译:巴拿马运河的扩建仍在继续

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Panama Canal Expansion is moving forward to reach its goal of bolstering the waterway's capacity in order to provide a better service to customers. To date, the programme is 50% complete. 'The programme continues to progress and reach milestones while we focus the next phases on building the locks," said Panama Canal Administrator Jorge L Quijano. Beginning during 2013, the Expansion Programme has completed several projects: 1. Dredging of the navigational channels has been completed. This included both Canal entrances, on the Pacific and Atlantic sides, as well as Gaillard Cut. The remaining dredging work to be done in Gatun Lake is expected to be completed this year.
机译:巴拿马运河扩建工程正在朝着实现其提高水运能力的目标前进,以便为客户提供更好的服务。迄今为止,该程序已完成50%。巴拿马运河管理局局长Jorge L Quijano说:“我们将在下一阶段将重点放在建造船闸时,该计划将继续取得进展并达到里程碑。”从2013年开始,扩展计划已完成了多个项目:1.疏通航道包括太平洋和大西洋两岸的运河入口以及盖拉德切(Gaillard Cut),其余在Gatun湖进行的疏dr工作预计将在今年完成。

著录项

  • 来源
    《Port Engineering Management》 |2013年第2期|39-39|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号