...
首页> 外文期刊>Port Engineering Management >London Gateway development continues
【24h】

London Gateway development continues

机译:伦敦门户的发展仍在继续

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The DP World London Gateway development continues with the arrival of three giant quay cranes during early March when the heavy-lift vessel Zhen Hua 26 arrived at the location following a three month voyage from China's Shanghai Zhenhua Heavy Industries Company (ZPMC). The biggest ever to be delivered to the UK, the cranes are 138 m tall and weighing 2,000 t, and were upright on the ship. These will be just the first quay cranes destined for London Gateway. A further 21 will be delivered once construction on the six main berths is completed. The quay itself - where the cranes will sit - will be over 2.5 kms in length and a draft of 50 m once the port is fully operational.
机译:3月初,随着来自中国上海振华重工公司(ZPMC)的3个月航程,重型起重船振华26号抵达该地点,DP世界伦敦门户的发展继续进行,三台巨型码头起重机也随之抵达。这些起重机是英国最大的起重机,高138 m,重2,000 t,直立在船上。这些将只是前往伦敦盖特威的第一批码头起重机。六个主要泊位的建设完成后,还将交付另外21辆。一旦港口全面投入运营,码头本身(起重机将坐在那里)的长度将超过2.5公里,吃水深度为50 m。

著录项

  • 来源
    《Port Engineering Management》 |2013年第2期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号