...
首页> 外文期刊>Port Engineering Management >Damen delivers cable installer to Maersk Supply Service
【24h】

Damen delivers cable installer to Maersk Supply Service

机译:达门将电缆安装器交付给马士基供应服务

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

During February this year, the DP2 cable installation vessel Maersk Connector was handed over from Damen Shipyards Group to Maersk Supply Service. The vessel is going directly on a long-term charter for subsea services provider DeepOcean. The on-time, on-budget delivery marks the successful cooperation between Damen, Maersk Supply Service and DeepOcean. Based on Damen's DOC 8500 platform, the vessel has been customised to meet the challenges of reducing offshore renewables costs.
机译:今年2月,DP2电缆安装船Maersk Connector从Damen Shipyards Group移交给了Maersk Supply Service。该船直接与海底服务提供商DeepOcean签订长期租船合同。准时,按预算交付标志着达门,马士基供应服务和DeepOcean之间的成功合作。该船基于Damen的DOC 8500平台进行了定制,以应对降低海上可再生能源成本的挑战。

著录项

  • 来源
    《Port Engineering Management》 |2016年第2期|32-32|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号