...
首页> 外文期刊>Port Engineering Management >BSP piling hammers key to reconstruction of the Port of Durban
【24h】

BSP piling hammers key to reconstruction of the Port of Durban

机译:BSP打桩锤是德班港重建的关键

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Work is well underway for the reconstruction and deepening of the Port of Durban, Maydon Wharf, South Africa's largest break-bulk and dry-bulk handling precinct in the Transnet ports system, which has been developed in phases since the early twentieth century. The wharf covers 120 ha and includes 15 berths that are collectively able to handle over seven million tonnes yearly. Development will ensure that the infrastructure will be operational for the next 50 years as well as catering for the newer generations of vessels using the port's facilities.
机译:自20世纪初以来分阶段开发的Transnet港口系统中,南非最大的散杂货和干散货装卸区-德班港,梅登码头的重建和深化工作正在进行中。码头占地120公顷,包括15个泊位,这些泊位每年能够处理700万吨以上的货物。开发将确保该基础设施在未来50年内能够正常运行,并使用该港口的设施迎合新一代船只。

著录项

  • 来源
    《Port Engineering Management》 |2016年第2期|16-17|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号