...
首页> 外文期刊>Port Engineering Management >Testing of new Panama Canal locks carried out successfully
【24h】

Testing of new Panama Canal locks carried out successfully

机译:新巴拿马运河船闸的测试成功进行

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Panama Canal Authority (ACP) has announced that Grupo Unidos por el Canal (GUPC), the consortium responsible for the design and construction of the Third Set of Locks Project, has successfully completed testing of the reinforcements in sill No. 3 of the Cocoli locks. GUPC technical personnel, the designers and ACP specialists monitored the testing process which consisted of gradually raising the water behind the lock gate to the level in which the seepage was first detected in sill No. 3 last August. Later, the testing was inspected by a team of independent experts, professors and structural engineers from the Technological University of Panama (UTP), all of whom expressed satisfaction with the final results.
机译:巴拿马运河管理局(ACP)宣布,负责设计和建造第三套船闸项目的财团Grupo Unidos por el Canal(GUPC)已成功完成对可可里3号门槛钢筋的测试。锁。 GUPC的技术人员,设计人员和ACP专家对测试过程进行了监控,包括逐步将闸门后面的水升高到去年8月第3号门槛首次发现渗水的水平。后来,测试由巴拿马技术大学(UTP)的一组独立专家,教授和结构工程师进行了检查,他们对最终结果表示满意。

著录项

  • 来源
    《Port Engineering Management》 |2016年第2期|12-12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号