...
首页> 外文期刊>Port Engineering Management >Jan De Nul successfully completes cable installation for the ADNOC
【24h】

Jan De Nul successfully completes cable installation for the ADNOC

机译:Jan De Nul成功完成了Adnoc的电缆安装

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Belgium's Jan De Nul Group has successfully completed the cable installation scope for the Phase Ⅱ Full Field Development of the NASR offshore oil field. Jan De Nul Group was subcontracted by Hyundai Heavy Industries for the cable loading, transport, laying and protection of three 1 32 kV subsea power cables (total length 147 kms) and 10x11 kV subsea power cables (total length 57 kms). The NASR oil field is located approximatelyl 30 kms northwest of Abu Dhabi and the project is part of the ADNOC strategic development programme to increase the field's capacity to 65,000 bbls/day.
机译:比利时的Jan de Nul Group已成功完成了NASR海上油田的Ⅱ期全面开发的电缆安装范围。 Jan De Nul Group由现代重工业分包,用于电缆装载,运输,铺设和保护三个1 32 kV海底电缆(总长度147公里)和10x11 kV海底电力电缆(总长度为57公里)。 NASR油田位于阿布扎比西北部约30公里公里,该项目是Adnoc战略发展计划的一部分,将该领域的能力增加到65,000个BBLS /天。

著录项

  • 来源
    《Port Engineering Management》 |2019年第2期|19-19|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号