首页> 外文期刊>Polish Maritime Research >STEAM TURBINE STAGE MODERNISATION IN FRONT OF THE EXTRACTION POINT
【24h】

STEAM TURBINE STAGE MODERNISATION IN FRONT OF THE EXTRACTION POINT

机译:抽汽点前的汽轮机阶段现代化

获取原文
获取原文并翻译 | 示例
       

摘要

The paper presents modernisation of the steam turbine stage situated in front of the turbine extraction point, based on a 225 MW turbine LP stage as an example. The modernised design is intended to better control the steam flow in this area. In the presented design a special ring is used to drive the steam leakage flow directly to the heat exchanger. The performed experiments and numerical analyses confirmed measurable exploitation and efficiency advantages of the introduced modernisation. So far, it has been successfully applied in a number of turbines working in inland power plants, but its use can be easily extended, without need for further modification and without advantage loss, to marine turbines, especially those used as main propulsion in sea-going vessels.
机译:本文以一个225 MW涡轮LP级为例,介绍了位于涡轮抽汽点前方的蒸汽涡轮级的现代化。现代化的设计旨在更好地控制该区域的蒸汽流量。在提出的设计中,使用特殊的环来驱动蒸汽泄漏流直接流向热交换器。进行的实验和数值分析证实了引入的现代化技术具有可衡量的开发和效率优势。到目前为止,它已经成功地应用于许多内陆发电厂的涡轮机中,但是它的应用可以很容易地扩展到船用涡轮机上,而无需进一步修改,也不会损失优势,特别适用于海上涡轮机,船只。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号