首页> 外文期刊>Polish Journal of Environmental Studies >Deposol Reclamation along a Canal of the Danube-Tisza-Danube Hydro System
【24h】

Deposol Reclamation along a Canal of the Danube-Tisza-Danube Hydro System

机译:沿多瑙河-蒂萨-多瑙河水力系统的运河进行的Deposol填海

获取原文
获取原文并翻译 | 示例
           

摘要

After the excavation of the canals of the main canal network (MCN) of the Danube-Tisza-Danube (DTD) hydro system, specific technological schemes were used to form deposited materials. In 1958 an experiment with forest plantings was set up on the deposols of the Odzaci-Sombor Canal. Its purpose was the protection and reclamation of the newly-formed dikes. The main aim of this paper is to point to the speed of the process of reclamation and changes in soil properties in the course of a 54-year-long experiment, on the basis of a years-long study of the experimental area.
机译:开挖多瑙河-蒂萨-多瑙河(DTD)水系的主渠网(MCN)的运河后,采用了特定的技术方案来形成沉积材料。 1958年,在Odzaci-Sombor运河的废料堆上进行了森林种植试验。它的目的是保护和填筑新形成的堤坝。本文的主要目的是在长达54年的实验区域研究的基础上,指出开垦速度和土壤性质的变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号