首页> 外文期刊>Platts Megawatt Daily >Clean Line ponders a path for Rock Island project
【24h】

Clean Line ponders a path for Rock Island project

机译:清洁生产线为岩岛项目思考

获取原文
获取原文并翻译 | 示例
           

摘要

Clean Line Energy Partners looks to be in whack-a-mole mode as itrnstruggles to develop five major high-voltage transmission linesrndesigned to carry thousands of megawatts of clean energy across arnlarge swath of the US.rnAs one issue seemingly is put to rest, another pops up.rnWith only a few weeks left in 2015, the Houston-based company isrntrying to figure out how to jump-start its mostly stalled, 500-mile RockrnIsland Clean Line project. The line would deliver 3,500 MW of renewablernenergy from northwest Iowa and surrounding regions into Illinois andrnpoints east into PJM Interconnection to help offset the retirement ofrnolder coal-fired generation mainly due to new EnvironmentalrnProtection Agency rules.
机译:Clean Line Energy Partners似乎正在努力开发五条主要的高压输电线路,旨在在美国阿纳德广大地区输送数千兆瓦的清洁能源。到2015年仅剩几周了,这家位于休斯顿的公司就在努力寻找如何启动其停滞不前的500英里RockrnIsland Clean Line项目的方法。该生产线将从爱荷华州西北部和周边地区向伊利诺伊州提供3500兆瓦可再生能源,向东向PJM互连网提供rnpoints,以帮助抵消主要由于环境保护局新规定而导致的燃煤发电的淘汰。

著录项

  • 来源
    《Platts Megawatt Daily》 |2015年第1130期|5-5|共1页
  • 作者

    Bob Matyi;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号