首页> 外文期刊>Platts Megawatt Daily >FER C offers tips on analyzing Clean Power Plan
【24h】

FER C offers tips on analyzing Clean Power Plan

机译:FER C提供了分析清洁能源计划的提示

获取原文
获取原文并翻译 | 示例
       

摘要

Flexibility built into the Clean Power Plan is expected to produce anrnarray of compliance approaches, which could prove challenging forrntransmission planning. Those challenges, however, could be easedrnwith the right modeling tools and techniques for evaluating potentialrnreliability impacts, the Federal Energy Regulatory Commission said.rnUnder the Clean Power Plan, which aims to slash the existingrngeneration fleet’s carbon emissions 32% from 2005 levels by 2030,rnstates have until September to submit implementation plans forrnmeeting the emission guidelines, with the option for a two-yearrnextension until September 2018. Each state must show that it tookrnreliability issues into account when it devised its plan to comply withrnthe rule. Power plants in states that do not create a plan would bernsubject to a federal implementation plan crafted by the EnvironmentalrnProtection Agency.
机译:清洁能源计划中内置的灵活性有望产生大量合规性方法,这可能会证明具有挑战性的有害传输计划。联邦能源管理委员会说,然而,使用正确的建模工具和技术来评估潜在的可靠性影响可以缓解这些挑战。根据清洁能源计划,该计划旨在到2030年将现有的发电车队的碳排放量从2005年的水平削减32%。必须在9月份之前提交满足排放准则的实施计划,并可以选择延长两年,直到2018年9月。每个州都必须表明,在制定计划以遵守该规则时必须考虑到可靠性问题。没有制定计划的州的发电厂将受到环境保护署制定的联邦实施计划的约束。

著录项

  • 来源
    《Platts Megawatt Daily》 |2016年第0121期|4-51|共3页
  • 作者

    Jasmin Melvin;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:46:41

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号