...
首页> 外文期刊>Platts Megawatt Daily >ISO New England interconnection reform OK'd
【24h】

ISO New England interconnection reform OK'd

机译:ISO新英格兰互连改革确定

获取原文
获取原文并翻译 | 示例
           

摘要

ISO New England's attorneys have the go-ahead to submit tariffrnrevisions allowing the clustering of interconnection requests for studyrnand cost-allocation purposes after the proposal was endorsed Friday by the New England Power Pool Participants Committee.rn"The purpose of the Interconnection Clustering Revisions is tornprovide a clustering mechanism by which projects can be studied andrninformation provided about the needed infrastructure and costs in arntransparent way, so that projects can decide whether or not to movernforward, and thereby help to reduce or eliminate backlogs in therninterconnection queue caused by the lack of transmissionrninfrastructure," according to a memo to the committee from EricrnRunge, NEPOOL counsel.
机译:新英格兰电力池参与者委员会在周五批准该提案后,ISO新英格兰的律师可以批准关税修订,以便将互连请求进行集群以进行研究和成本分配。rn“互连集群修订的目的已被废除一种集群机制,通过该机制可以研究项目并以透明的方式提供所需的基础设施和成本的信息,以便项目可以决定是否继续前进,从而有助于减少或消除因缺乏基础设施传输而导致的互连队列中的积压工作,根据NEPOOL律师EricrnRunge给委员会的备忘录。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号