...
首页> 外文期刊>Platts Megawatt Daily >ERCOT panel favors winter inspection fee plan, generation reinstatement proposal
【24h】

ERCOT panel favors winter inspection fee plan, generation reinstatement proposal

机译:ERCOT小组最受欢迎的冬季检查费计划,发电恢复提案

获取原文
获取原文并翻译 | 示例
           

摘要

A key Electric Reliability Council of Texas stakeholder panel on Nov. 17 rejected a generator winterization inspection fee schedule proposed by staff in favor of allocating the actual costs as fees for all generators generally on a “Net Dependable Capability” share basis. However, an ERCOT staff proposal to expedite the return to service of generation capacity that has been retired less than three years received support by the majority during the Nov. 17 Protocol Revision Subcommittee, which staff was told will result in additional capacity for the coming 2021-22 winter peak.
机译:11月17日德克萨斯州利益攸关方专家组重点电力可靠性委员会驳回了工作人员提出的发电机冬季化检验费表,以便通常对所有发电机的费用分配实际成本,通常就“可靠的能力”股份。 但是,艾尔省员工提案加快返回的发电能力返回,该公司在11月17日议定书修订小组委员会在11月17日议定书修订小组委员会期间收到了不到三年的支助,该工作人员被告知将导致即将到来的2021年额外的能力 -22冬季峰。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号