...
首页> 外文期刊>Platts Energy Trader >ERCOT panel favors winter inspection fee plan, generation reinstatement proposal
【24h】

ERCOT panel favors winter inspection fee plan, generation reinstatement proposal

机译:ERCOT小组最受欢迎的冬季检查费计划,发电恢复提案

获取原文
获取原文并翻译 | 示例
           

摘要

A key Electric Reliability Council of Texas stakeholder panel on Nov. 17rejected a generator winterization inspection fee schedule proposed bystaff in favor of allocating the actual costs as fees for all generatorsgenerally on a “Net Dependable Capability” share basis.However, an ERCOT staff proposal to expedite the return to serviceof generation capacity that has been retired less than three yearsreceived support by the majority during the Nov. 17 Protocol RevisionSubcommittee, which staff was told will result in additional capacityfor the coming 2021-22 winter peak.
机译:11月17日德克萨斯州利益攸关方专家组关键电力可靠性委员会 拒绝了发电机冬季化检查费表 员工支持将实际成本分配为所有发电机的费用 通常在“净可靠的能力”份额上。 但是,艾际员工提案加快返回服务 已经退休的发电能力不到三年 在11月17日议定书修订期间获得了大多数人的支持 小组委员会被告知哪些员工将导致额外的能力 即将到来的2021-22冬季峰。

著录项

  • 来源
    《Platts Energy Trader》 |2021年第18期|127-32|共7页
  • 作者

    Mark Watson;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号