首页> 外文期刊>Platts Megawatt Daily >ERCOT faces ‘disaster after disaster’ if market reforms ignore loads: expert
【24h】

ERCOT faces ‘disaster after disaster’ if market reforms ignore loads: expert

机译:如果市场改革忽略了负荷:专家,ercot面临“灾难后的灾难”

获取原文
获取原文并翻译 | 示例
           

摘要

The Electric Reliability Council of Texas will face “disaster after disaster” if Texas regulators ignore the potential for energy efficiency and demand response in reforming ERCOT’s market design, a former state and federal energy regulatory official said Aug. 24. Doug Lewin, president of the Stoic Energy consultancy, moderated a media briefing Aug. 24 about the Public Utility Commission of Texas’ effort to redesign the ERCOT market, which he said is on “an incredibly aggressive timeline.” The PUC will conduct a workshop Aug. 26 to address specifics in its Project No. 52373, Review of Wholesale Electric Market Design. PUC Chairman Peter Lake on Aug. 4 laid out a timeline leading the to finalization of market design reforms on Dec. 19.
机译:德克萨斯州的电力可靠性委员会将面临“灾难造成灾难”,如果德克萨斯州监管机构忽视了改革埃尔思市场设计方面的能源效率和需求反应的潜力,一个前州和联邦能源监管官员8月24日。杜根·莱灵,主席 斯多葛能源咨询,安排媒体简报24关于德克萨斯州德克萨斯州的公共实用委员会重新设计了埃尔尔市场,他说的是“一个令人难以置信的激进时间表”。 PUC将于8月26日举办研讨会,以解决其项目第52373号项目的详情,审查批发电力市场设计。 PUC董事长彼得湖8月4日布置了一系列时间表,导致12月19日的市场设计改革完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号