首页> 外文期刊>Platts Megawatt Daily >SMUD's South Fork Powerhouse hydroelectric project begins operations
【24h】

SMUD's South Fork Powerhouse hydroelectric project begins operations

机译:SMUD的南叉推动力水力发电项目开始运营

获取原文
获取原文并翻译 | 示例
       

摘要

The Sacramento Municipal Utility District's 2.7-MW South Fork Powerhouse hydroelectric project began operations, providing electricity counting towards California's Renewable Portfolio Standard, the utility said. Because the new powerhouse is considered a "small hydro" project, which is categorized as less than 30 MW, the electricity it produces will count toward the state Renewable Portfolio Standard, SMUD said Sept. 28. California's RPS program requires utilities obtain 60% renewable supply by 2030 and be 100% carbon free by 2045. "The new South Fork Powerhouse allows us to generate more carbon-free renewable energy," SMUD Chief Energy Delivery Officer Frankie McDermott said in the statement.
机译:该实用公司表示,萨克拉门托市公用事业区的2.7兆瓦南叉市政府水电项目开始运营,为加州的可再生组合标准提供电力计数。由于新的强者被认为是一个“小型水电”项目,该项目被分类为不到30兆瓦,它产生的电力将计入国家可再生组合标准,Smud表示,9月28日。加州的RPS计划要求公用事业可再生60% 2030年供应到2045年的100%无碳。“新的南叉推动力使我们能够产生更多的无碳可再生能源,”Smud首席能源交付官Frankie McDermott在该声明中表示。

著录项

  • 来源
    《Platts Megawatt Daily》 |2020年第30期|6-7|共2页
  • 作者

    Kassia Micek;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 22:39:05

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号