...
首页> 外文期刊>Platts Megawatt Daily >MISO subcommittee to review feedback on rules ensuring availability of capacity
【24h】

MISO subcommittee to review feedback on rules ensuring availability of capacity

机译:MISO小组委员会审查有关确保容量可用性的规则的反馈

获取原文
获取原文并翻译 | 示例
           

摘要

A Midcontinent Independent System Operator subcommittee will review feedback requested by Friday on rules designed to ensure the capacity availability of generating assets that have planned outages longer than 90 days. MISO’s Resource Adequacy Subcommittee said in a recent report that the target of the rules are generators that have cleared the Planning Resource Auction but are offline for extended periods of time due to unforced outages.
机译:中大陆独立系统运营商小组委员会将审查周五要求的有关规则的反馈,这些规则旨在确保计划中断时间超过90天的发电资产的容量可用性。 MISO的资源充足性小组委员会在最近的一份报告中说,规则的目标是已经清除了规划资源拍卖的发电机,但是由于非强制中断而长时间处于离线状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号