首页> 外文期刊>Platts Megawatt Daily >Eastern US ISOs have over 50 GW of gas and oil projects in interconnection queues
【24h】

Eastern US ISOs have over 50 GW of gas and oil projects in interconnection queues

机译:美国东部ISO的互连队列中有超过50 GW的天然气和石油项目

获取原文
获取原文并翻译 | 示例
           

摘要

PJM Interconnection, ISO New England and the New York IndependentSystem collectively have over 50 GW of natural gas and oil powergeneration projects in their interconnection queues at a time whenseveral states are looking to eliminate the use of these fuels.The largest market, PJM, leads the way with roughly three quartersthe volume of potential fossil fuel projects as the other two gridoperators combined. PJM has over 40 GW of mostly natural gasprojects queueing up for power grid interconnection.Any resource that wants to connect to a regional power grid mustprogress through a formal interconnection process. Not every resource willultimately connect to the grid, but the queues provide a view of the level ofmarket participants’ interest in various power generation resources.
机译:PJM互连,ISO新英格兰和纽约独立 r n系统在各个州都希望消除使用时,它们的互连队列中总共有超过50 GW的天然气和石油发电项目 r n最大的市场PJM以潜在的化石燃料项目的数量大约四分之三领先于其他两个电网运营商的总和。 PJM有超过40 GW的天然气项目正在排队进行电网互连。 r n任何要连接到区域电网的资源都必须通过正式的互连过程进行发展。并非所有资源都能 r n最终连接到电网,但是队列提供了市场参与者对各种发电资源的兴趣程度的视图。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号