首页> 外文期刊>Platts Megawatt Daily >Chatterjee rekindles grid resilience debate with call for state, grid operator engagement
【24h】

Chatterjee rekindles grid resilience debate with call for state, grid operator engagement

机译:Chatterjee通过呼吁州,电网运营商参与来重新启动电网弹性辩论

获取原文
获取原文并翻译 | 示例
           

摘要

Federal Energy Regulatory Commission action on grid resilience couldbe forthcoming, Chairman Neil Chatterjee suggested Wednesday.After nixing a contentious proposal (RM18-1) from the Departmentof Energy to institute new market rules providing for full-cost recoveryand a return on investment for generators with 90-day on-site fuelsupplies, FERC in January 2018 launched a holistic review (AD18-7) ofthe resilience of the bulk power system. The agency said the results ofthat review would determine whether commission action on gridresilience was warranted.The comment window for that proceeding closed over a yearago, and the commission had mostly been mum on what, if any,next steps would follow. This led some to wonder whether the issuehad been usurped by other concerns and was essentially dead atFERC, especially in light of several federal efforts to curbretirements of coal and nuclear units in the name of resilience andnational security that were met with much resistance and foundlittle success.
机译:主席查尔斯吉(Neil Chatterjee)星期三建议,联邦能源管理委员会(Federal Energy Regulatory Commission)应对电网弹性的行动可能即将出炉。 r n在能源部提出一项有争议的提案(RM18-1)之后,该协会将制定新的市场规则以提供全面的成本回收 r n和使用90天现场燃料的发电机的投资回报 r nsupplis,FERC在2018年1月启动了对大功率系统弹性的整体评估(AD18-7) 。该机构表示,审查结果将确定是否有必要对电网采取抗辩措施。 r n该程序的评论窗口已关闭了一年时间 r nago,而且该委员会大部分时间都是妈妈 r nn下一步,如果有的话。这使一些人想知道,该问题是否已被其他担忧所篡改,并基本上在FERC上死了,特别是鉴于联邦政府采取了若干以抗灾力名义遏制煤炭和核单位退休的努力和 r n国家安全受到极大的抵抗,却几乎没有成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号