Midcontinent Independent System Operator has filed tariff changesaimed at improving generator outage scheduling practices, wrappingup a three-part proposal on near-term improvements to address theregion's changing resource availability and free up 5-10 GW of capacitybefore the spring outage season.MISO has seen its excess reserve margins dwindle in the face ofcoal and nuclear retirements, lessening the operational flexibility of thesystem. And increased forced outage rates combined with overlap inthe timing of planned generator outages and de-rates have exposedMISO to more risk outside of its traditional summer peak times, thegrid operator said Wednesday in its filing (ER19-915) with the FederalEnergy Regulatory Commission.
机译:中部大陆独立系统运营商已提出电价更改, r n旨在改善发电机停运调度做法,包装 r n关于近期改进的三部分提案,以解决该地区不断变化的资源可用性并释放5-10 GW的容量 r n在春季停运季节之前。 r nMISO在面对 r n煤和核能退役的情况下,其超额的储备利润正在减少,从而降低了该系统的运营灵活性。 r ngrid运营商周三在提交的文件中表示,强制停运率的上升加上计划中的发电机停运和降额的时间安排重叠,使MISO在传统的夏季高峰时段之外面临更多风险。 (ER19-915)与联邦 r n能源监管委员会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号