首页> 外文期刊>Platts Megawatt Daily >FERC seeks clarity on SPP plan requiring variable resources to become dispatchable
【24h】

FERC seeks clarity on SPP plan requiring variable resources to become dispatchable

机译:FERC寻求关于SPP计划的明确要求,要求可变资源可调度

获取原文
获取原文并翻译 | 示例
           

摘要

Southwest Power Pool's proposal requiring most variable energyresources in its footprint to be dispatchable left Federal EnergyRegulatory Commission staff with questions on its implementation andimpacts, according to a letter sent to the grid operator Thursday.SPP's proposal, aimed at improving reliability and correctingmarket inefficiencies, would require variable energy resources toregister as and convert to dispatchable variable energy resources bythe later of January 1, 2021, or the 10-year anniversary of their originalcommercial operation date, according to a November 16 tariff filing(ER19-356).
机译:根据周四发给电网运营商的一封信,西南发电局的提案要求其占地面积中的大部分可变能源必须可调度,这使联邦能源管理委员会的工作人员对其实施和影响产生疑问。 SPP的提案旨在提高可靠性并纠正市场效率低下,要求可变能源在2021年1月1日(即10月1日)晚之前注册并转换为可分配的可变能源。根据11月16日的关税文件 r n(ER19-356),其原始 r n商业运营日期的周年纪念日。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号