首页> 外文期刊>Inside NRC >NRC safety review of Grand Gulf-1rnlicense renewal expected in April
【24h】

NRC safety review of Grand Gulf-1rnlicense renewal expected in April

机译:美国国家铁路公司(NRC)对4月大海湾1号许可证换证的安全性审查

获取原文
获取原文并翻译 | 示例
           

摘要

NRC staff plans to issue in April its final safety evaluation report forrnEntergy’s application to renew the operating license of Grand Gulf-1 inrnMississippi, according to a schedule issued by staff February 3.rnAll open items contained in an earlier version of the SER issued inrnJanuary 2013 (INRC, 11 Feb ’13, 6) have now been closed. NRC said in arnFebruary 3 letter to Entergy that staff had closed one open item,rnrelating to the calculation methods used by Entergy in the Grand Gulf-1rnneutron fluence analyses. The three other open items related to agingrnmanagement programs at the unit and were closed in late 2013.
机译:NRC工作人员计划根据工作人员2月3日发布的时间表,在4月份发布其最终安全评估报告fornEntergy申请续签Grand Gulf-1 inrnMississippi的营业执照。rn2013年1月发布的SER早期版本中包含的所有未清项目(INRC,13年2月11日,6)已关闭。 NRC在2月3日收到给Entergy的信中说,工作人员已经关闭了一个未清项目,这与Entergy在Grand Gulf-1rntron中子注量分析中使用的计算方法有关。其他三个与该部门老化管理计划有关的未完成项目于2013年底关闭。

著录项

  • 来源
    《Inside NRC》 |2016年第3期|4-4|共1页
  • 作者

    Jim Ostroff;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号