首页> 外文期刊>Platts Energy Trader >Freeport LNG output remains offline as utility works to restore power after storm
【24h】

Freeport LNG output remains offline as utility works to restore power after storm

机译:Freeport LNG输出仍然脱机,因为实用程序工作要在风暴后恢复电量

获取原文
获取原文并翻译 | 示例
           

摘要

Freeport LNG production remained offline for a second consecutive day Sept. 15, as power transmission operator CenterPoint worked to restore electricity to the facility that was knocked out by Hurricane Nicholas. A spokesperson for the 15 million mt/year capacity export terminal was unable to say when the three liquefaction trains would be able to resume service. “Our production remains offline until CenterPoint completes repair work on their system,” the spokesperson, Heather Browne, said in an email responding to questions. Nicholas hit the Texas Gulf Coast early Sept. 14 as a Category 1 hurricane, bringing 75 mph winds and heavy rain. The storm made landfall along the coast west of the small island in Brazoria County where Freeport LNG is located. Widespread power outages were reported in the county and across the Houston area.
机译:FARVPORT LNG生产连续第二天离线仍然离线,9日连续第二天。电力传输操作员中心投资恢复电力到尼古拉斯飓风淘汰的设施。 当三个液化火车将能够恢复服务时,1500万MT /年的发言人无法说。 “我们的生产仍然脱机,直到中心点在其系统上完成维修工作,”Shekesperson Heather Browne在电子邮件中响应了问题。 尼古拉斯于9月初袭击了德克萨斯州海湾海岸,作为1类飓风,带来75英里/小时的风和大雨。 弗里帕洛里亚县的小岛西部海岸的风暴沿着弗里波特LNG所在地。 在县和休斯顿地区举行了广泛的停电。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号