首页> 外文期刊>Platts Energy Trader >SRP proposes to expand Coolidge gas-fired power capacity as bridge to more solar
【24h】

SRP proposes to expand Coolidge gas-fired power capacity as bridge to more solar

机译:SRP建议将Coolidge燃气发电能力扩展为桥梁到更多的太阳能

获取原文
获取原文并翻译 | 示例
           

摘要

Salt River Project wants to expand capacity at its quick-start, naturalgas-fired Coolidge Generating Station plant to ensure a reliable backupfor the Arizona utility's planned increase of solar-generated power, SRPsaid Aug. 25.The proposal, which has been sent for approval to SRP’s Board,would increase the power plant’s number of single-cycle gas turbinesto 28 from 12, increasing the plant’s capacity by 820 MW, toapproximately 1,390 MW. Coolidge Generating Station has a quick-starttime of 10 minutes, according to SRP’s website.
机译:盐河项目希望在快速启动,自然时扩大容量 燃气凉爽的生成站工厂,以确保可靠的备份 对于亚利桑那州的太阳能电力计划增加,SRP 8月25日说。 该提案已被发送给SRP董事会批准, 会增加电厂的单循环燃气轮机数量 从12开始到28,将工厂的容量增加820 mW 大约1,390兆瓦。 Coolidge生成站快速启动 根据SRP的网站,10分钟的时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号