...
首页> 外文期刊>Platts Energy Trader >TVA, Facebook, RWE team up on 150-MW solar plant near Memphis, Tennessee
【24h】

TVA, Facebook, RWE team up on 150-MW solar plant near Memphis, Tennessee

机译:TVA,Facebook,RWE在田纳西州孟菲斯附近的150兆瓦太阳能厂队

获取原文
获取原文并翻译 | 示例

摘要

Germany’s RWE is joining with Facebook and the Tennessee Valley Authority to install a 150-MW solar facility near Memphis, Tennessee, to start up in 2023, which would represent an 81% increase from the state’s 185-MW current solar capacity. Facebook plans to use 110 MW of the Shelby County, Tennessee, facility’s output for its data center in Gallatin, Tennessee. Construction is to start in mid-2022, and operations should start in late 2023. RWE will own and operate the plant with a long-term power purchase agreement with the TVA. Construction is expected to cost about $140 million. “Bringing clean energy to Shelby County is part of our long-term community support plan, and is critical to support our region’s sustainability strategy,” said Doug Perry, TVA senior vice president for commercial energy solutions. “This project is more than a solar farm, it puts people to work, revitalizes communities and makes our region an environmental leader.”
机译:德国的RWE正在加入Facebook和Tennessee Valley的权限,在田纳西州孟菲斯靠近孟菲斯靠近孟菲斯的太阳能设施,于2023年启动,这将从该国的185兆瓦目前的太阳能增加81%。 Facebook计划使用110兆瓦的Shelby县,田纳西州,田纳西州加拉丁的数据中心的产量。 建设是在2022年中期开始,运营应于2023年底开始.RWE将拥有并与TVA有长期的电力购买协议运营工厂。 预计建设将花费约1.4亿美元。 “为谢尔比县带来清洁能源是我们长期社区支持计划的一部分,并且支持我们所在地区的可持续发展战略至关重要,”Doug Perry,TVA商业能源解决方案高级副总裁Doug Perry说。 “这个项目不仅仅是太阳能农场,它让人们工作,振兴社区,使我们的地区成为环境领导者。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号