...
首页> 外文期刊>Platts Energy Trader >NV Energy pitches solar-plus-storage projects to replace coal plant
【24h】

NV Energy pitches solar-plus-storage projects to replace coal plant

机译:NV Energy Stances Solar-Plus-Storage项目取代煤炭植物

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A red-hot market for large-scale battery-backed photovoltaic power plants, Nevada is adding to a rapidly expanding queue of solar-plusstorage complexes intended to help the state meet a 50% renewable portfolio standard by 2030 and eliminate carbon-dioxide emissions from its power mix by midcentury. NV Energy Inc., the state's largest utility, is seeking approval from the Public Utilities Commission of Nevada for agreements underpinning a pair of projects pitched in Humboldt County, Nev. - the 250-MW Iron Point Solar Project, combined with 200 MW of battery storage, and the 350-MW Hot Pot Solar Project, with 280 MW of battery storage - the Berkshire Hathaway Energy subsidiary announced June 2.
机译:内华达州大型电池支持光伏发电厂的红热市场正在加入旨在通过2030年通过2030年达到50%可再生产品组合标准的迅速扩展的太阳能架构复合物队列,并消除了二氧化碳排放量 它的助力组合由midcantury混合。 国家最大的效用NV Energy Inc.正在寻求内华达州的公用事业委员会批准,以获得一对项目的协议,该项目在亨德尔特县,内华州举行,250 MW铁点太阳能项目,与200兆瓦的电池联合 储存和350 MW热锅太阳能项目,280 MW的电池储存 - 伯克希尔Hathaway Energy Subsadive 6月2日宣布。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号