...
首页> 外文期刊>Platts Energy Trader >Kinder Morgan's Elba Liquefaction conducting routine maintenance at US facility
【24h】

Kinder Morgan's Elba Liquefaction conducting routine maintenance at US facility

机译:Kinder Morgan的Elba液化在美国设施进行常规维护

获取原文
获取原文并翻译 | 示例

摘要

Kinder Morgan’s Elba Liquefaction was undergoing routine maintenance Dec. 3, resulting in a drop in feedgas deliveries to the Georgia terminal. The operator of the smallest of the six major US LNG export facilities did not specify how many of the terminal's 10 units the work involved. “Some maintenance activities are occurring and are expected to be complete in the near term,” spokeswoman Katherine Hill said. In addition to the maintenance, one of the terminal’s units remained offline due to damage from a fire in May. Kinder Morgan has not said when Unit 2 will resume service or why assessing the cause of the fire and implementing a repair plan has taken an extended period of time. Gas deliveries to the facility totaled 185 MMcf/d on Dec. 3, down from 220 MMcf/d on Dec. 1 and a high of 280 MMcf/d on Nov. 30, S&P Global Platts Analytics data show. Total US LNG feedgas flows registered 10.5 Bcf/d on Dec. 3, down from a record 11.3 Bcf/d on Dec. 1.
机译:Kinder Morgan的Elba液化正在进行常规维护12月3日,导致对佐治亚州终端的饲料递送下降。美国六大局域网最小的运营商没有指定终端的10个单位所涉及的工作中有多少。 “一些维护活动正在发生,预计将在近期完成,”凯瑟琳希尔说。除了维护之外,由于5月的火灾造成损坏,其中一个终端的单位仍然离线。当单位2将恢复服务或为什么评估火灾和实施修理计划的原因时,请延长一段时间。 10月3日,12月3日,12月30日,S&P Global Platts Analytics数据展示,Gir Instault of Co.120 MMCF / D为220 mmcf / d。美国全液化银行总计12月3日注册了10.5个BCF / D,从12月1日开始记录11.3 BCF / D。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号