首页> 外文期刊>Platts Energy Trader >FERC grants Columbia more time for pipe project facing easement hurdles
【24h】

FERC grants Columbia more time for pipe project facing easement hurdles

机译:FERC补助哥伦比亚更多的时间用于管道项目面临落地障碍

获取原文
获取原文并翻译 | 示例
       

摘要

The Federal Energy Regulatory Commission granted Columbia Gas Transmission a three-year extension on authorization to build the Eastern Panhandle Expansion Project in Maryland, setting aside objections from individuals and environmental groups. The 3.4-mile, 47,500 Dt/d interstate natural gas pipeline project, which will deliver gas supplies from Pennsylvania to West Virginia utility Mountaineer Gas in Morgan County, has faced strong opposition despite its small scale. Faced with a Maryland denial and adverse court rulings related to a state easement needed to cross the Western Maryland Rail Trail in Maryland, Columbia in early July asked FERC for a three-year extension until July 19, 2023, of its authorization to build the project.
机译:联邦能源监督委员会授予哥伦比亚燃气传输,授权建立三年延长马里兰州的东部攀桅省扩建项目,为个人和环境团体的异议撇开。 3.4英里,47,500名DT / D州际天然气管道项目,将在摩根县提供来自宾夕法尼亚州宾夕法尼亚州的天然气供应,尽管规模小,但仍面临强劲的反对。面对马里兰州拒绝和不利的法院裁决,与在马里兰州马里兰州的西部马里兰州铁路径,哥伦比亚在7月初的哥伦比亚提出了一个三年的延期,直到2023年7月19日,授权建立项目。

著录项

  • 来源
    《Platts Energy Trader》 |2020年第27期|21-22|共2页
  • 作者

    Maya Weber;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号