...
首页> 外文期刊>Platts Energy Trader >Cameron LNG Train 2 reaches mechanical, regulatory milestones
【24h】

Cameron LNG Train 2 reaches mechanical, regulatory milestones

机译:Cameron LNG Train 2达到机械,监管里程碑

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Sempra Energy’s Cameron LNG export facility in Louisianareceived a battery of regulatory approvals Friday for commissioningrelatedprocedures at its second liquefaction train, moving the unitcloser to commercial startup by early next year.In a Federal Energy Regulatory Commission filing, regulators gaveCameron the go-ahead on a variance request for commissioningprocedures at Train 2, along with an authorization to introducehazardous fluids and commission the unit’s ISBL Hot Oil System and PRGas Turbine.Similar commissioning-related authorizations from FERC atCameron’s Train 1 – issued from mid-December 2018 to early January2019 were followed by a late-March startup to initial gas deliveries.
机译:森帕拉能源公司位于路易斯安那州的卡梅伦液化天然气出口设施上周五获得了一系列第二轮液化火车调试相关程序的监管批准,并将该装置在明年年初移交给商业启动。在联邦能源监管委员会的文件中,监管机构对卡梅隆提出了异议。要求在2号火车上进行调试,并要求引入危险液体并调试该机组的ISBL热油系统和PRGas涡轮机.2018年12月中旬至2019年1月上旬,FERC在卡梅伦1号火车上发出了类似的调试相关授权。 3月下旬启动到初始天然气交付。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号