首页> 外文期刊>Energy economist >Piper Alpha 25 years on
【24h】

Piper Alpha 25 years on

机译:Piper Alpha 25年

获取原文
获取原文并翻译 | 示例
       

摘要

Whichever way it is viewed the Piper Alpha disaster was the result of plain incompetence. The litany of mistakes made and revealed by the public enquiry led by Lord Cullen makes astounding reading in today's climate. Routine maintenance on two condensate pumps went unfinished. A pressure safety valve was removed from Pump A leaving only Pump B safe to operate, a fact that was not passed on to the incoming shift. Meanwhile, the automatic fire-fighting system was put under manual control, its emergency seawater pumps shut down.
机译:不管以哪种方式看待,派珀阿尔法灾难都是无能的结果。在库伦勋爵的带领下进行的公开调查所犯并揭示的一连串错误,在当今的气候下令人震惊。两个冷凝水泵的日常维护未完成。从泵A上拆下了一个压力安全阀,仅使泵B可以安全运行,这一事实并未传递给输入的换档。同时,自动灭火系统处于手动控制下,紧急海水泵关闭。

著录项

  • 来源
    《Energy economist》 |2013年第382期|13-15|共3页
  • 作者

    Chris Cragg;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号