首页> 外文期刊>Platts Energy Economist >Constitution project clears US environmental hurdle
【24h】

Constitution project clears US environmental hurdle

机译:宪法项目清除了美国的环境障碍

获取原文
获取原文并翻译 | 示例
       

摘要

Adverse environmental impacts from Constitution Pipeline’s plan to build a 124-mile pipeline to meet gas demand in New York and New England would be “lessthan- significant”, if certain mitigation measures are implemented, FERC staff said in a final environmental impact statement released in October. The Constitution Pipeline Project, in conjunction with the Wright Interconnect Project proposed by Iroquois Gas Transmission System, would deliver up to 650,000 Dt/d of gas from Susquehanna County, Pennsylvania, to an interconnect with Tennessee Gas Pipeline and Iroquois systems in Wright, New York, for ultimate delivery into premium New York and New England markets.
机译:FERC的工作人员在2004年发布的最终环境影响声明中说,如果实施某些缓解措施,那么宪法管道计划建造一条124英里长的管道以满足纽约和新英格兰的天然气需求的不利环境影响将“不那么重要”。十月。宪法管道项目与易洛魁输气系统提出的莱特互连项目相结合,将从宾夕法尼亚州的萨斯奎哈纳县输送高达650,000 Dt / d的天然气,与纽约赖特的田纳西天然气管道和易洛魁系统进行互连,以最终交付到优质的纽约和新英格兰市场。

著录项

  • 来源
    《Platts Energy Economist》 |2014年第397期|49-49|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号