首页> 外文期刊>Power in Europe >Iberdrola advances Castellon
【24h】

Iberdrola advances Castellon

机译:伊贝德罗拉推进卡斯特利翁

获取原文
获取原文并翻译 | 示例
           

摘要

A proposal by Iberdrola to install a 1.1 GW gas-fired, combined-cycle plant at Castellon in the eastern Valencia region has reached the public Input stage. The project, according to a March 12 notice in the official state gazette, is budgeted at €405 million and entails the conversion of the company's existing two-unit 1,085-MW oil-fired generator at the site, which began operating in the early 1970s. Interested parties have 30 days to examine filings related to the proposed development, including an environmental impact assessment, and submit comments.
机译:伊贝德罗拉(Iberdrola)提议在瓦伦西亚东部地区的卡斯特利翁(Castellon)安装一个1.1吉瓦的燃气联合循环电厂,该提议已进入公共投入阶段。根据3月12日官方公报上的通知,该项目的预算为4.05亿欧元,需要对该公司现有的两台1085兆瓦燃油发电机进行改造,该发电机于1970年代初开始运营。感兴趣的各方有30天的时间来审查与拟议开发项目相关的文件,包括环境影响评估并提交意见。

著录项

  • 来源
    《Power in Europe》 |2009年第547期|24-24|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号