...
首页> 外文期刊>Power in Europe >Oldbury Granted Reprieve
【24h】

Oldbury Granted Reprieve

机译:奥尔德伯里获准缓刑

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The 313-MW Oldbury-2 Magnox reactor will continue operating for up to two more years, having won a reprieve from safety authorities from its anticipated retirement at the end of December, 2008.rnThe Nuclear Decommissioning Authority said December 18 that Oldbury-2 had been granted approval to continue operating for a further period, "likely to be around two years."rnThe NDA statement did not say whether the 313-MW Oldbury-1 reactor, which is shut and awaiting safety approvals for restart, would also get permission for an extended operating period. Oldbury communications officer Saranne Postans, however, said the unit was expected to run an additional 22 months after its planned restart in January.
机译:313兆瓦的Oldbury-2 Magnox反应堆将继续运行长达两年,并已获得安全当局的延期,因为它已于2008年12月底退休。该核退役局在12月18日表示,Oldbury-2已经NDA的声明没有说已关闭并等待安全批准重启的313兆瓦Oldbury-1反应堆是否也将获得许可,该许可已经获得批准,可以继续进一步运行,“可能在两年左右。”延长运行时间。不过,奥尔德伯里通讯官Saranne Postans表示,该部门预计在计划于1月重启后再运行22个月。

著录项

  • 来源
    《Power in Europe》 |2009年第542期|68|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号