首页> 外文期刊>Power in Europe >Lago Bianco progresses
【24h】

Lago Bianco progresses

机译:白湖进展

获取原文
获取原文并翻译 | 示例
       

摘要

The commune of Poschiavo has voted in favour of the CHF 1.5 (€1.123) billion Repower Lago Bianco project for a 1,000 MW pumped storage dam in the Bernina Pass. The project would enrich the inhabitants of the valley with CHF 8 million a year for the next 80 years plus a CHF 5.1 million concession fee. The project, controversial for ecological reasons and because it will require the sacrifice of agricultural land, is expected to move quickly ahead in preparation for planning permission, which if granted would launch a six-year construction process. Two thirds of surplus electricity in off-peak hours would be used to pump water up from Poschiavo to Lago Bianco.
机译:Poschiavo镇投票通过了1.5亿瑞士法郎(合1.123亿欧元)的Repower Lago Bianco项目,该项目用于在Bernina Pass建造一座1000 MW抽水蓄能水坝。该项目将在接下来的80年里,每年以800万瑞士法郎的资金充裕该山谷的居民,外加510万瑞士法郎的特许权使用费。该项目因生态原因而引起争议,并且由于将需要牺牲农业用地,因此有望迅速进行以准备规划许可,如果获得许可,则将启动为期六年的建设过程。非高峰时段多余的三分之二的电力将用于将水从Poschiavo抽至Lago Bianco。

著录项

  • 来源
    《Power in Europe》 |2010年第588期|p.19|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:05:31

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号