...
首页> 外文期刊>Power in Europe >Capacity payment draft revised
【24h】

Capacity payment draft revised

机译:容量付款草稿修订

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The latest version of a new capacity payment decree was leaked to the Spanish press November 10, with gas-fired and hydro plants set to gain while coal-fired plant incentives have been cut. According to Cinco Dias, the new version retains June's draft increase in the incentive to invest in new gas-fired combined cycle power plants from the existing €20,000/MW installed to €26,000/MW, but increases the availability premium for CCGTs to €5,150/MW from €3,150/MW, extends that payment to "programmable" hydro power plants (hydro dams) and reduces the premium for imported coal plants from €20,750/MW to CCGT/hydro level's of €5,150/MW.
机译:最新的容量支付法令的最新版本已于11月10日泄露给西班牙媒体,燃气和水力发电厂将获得收益,而燃煤电厂的激励措施已被削减。根据Cinco Dias的说法,新版本保留了6月份增加的投资于新型燃气联合循环发电厂的激励计划草案,从现有的20,000欧元/兆瓦增加到26,000欧元/兆瓦,但将CCGT的可用性溢价提高到5,150欧元/ MW从3,150欧元/兆瓦起,将付款范围扩展到“可编程”水电厂(水坝),并将进口燃煤电厂的溢价从20,750欧元/兆瓦降至CCGT /水电水平的5,150欧元/兆瓦。

著录项

  • 来源
    《Power in Europe》 |2011年第613期|p.20|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号