...
首页> 外文期刊>Power in Europe >SSE, Shell in CCS deal
【24h】

SSE, Shell in CCS deal

机译:SSE,壳牌参与CCS交易

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Utility SSE and oil producer Shell have agreed to jointly develop a carbon capture and storage project at SSE's 1,760 MW Peterhead gas-fired power station in Aberdeenshire, Scotland, SSE said November 9. The aim is to design and develop a full chain facility that can capture CO2 post combustion from one 385-MW CCGT unit at the plant, before transporting the CO2 for storage in Shell's North Sea Goldeneye gas field. As far as possible the CO2 would be transported using existing infrastructure. SSE said the agreement would allow it to speed up pre-FEED studies, hopefully leading to a full Front-End Engineering Design study in the second half of 2012, if progress is made with securing funding from the European Union's NER-300 program.
机译:SSE 11月9日表示,SSE公用事业公司和石油生产商Shell同意在SSE位于苏格兰阿伯丁郡的1760 MW彼得黑德燃气电站联合开发碳捕集与封存项目。该项目的目的是设计和开发一个可从该工厂的一台385兆瓦CCGT装置捕获燃烧后的二氧化碳,然后再将二氧化碳运输到壳牌的北海金眼气田。二氧化碳将尽可能利用现有基础设施进行运输。 SSE表示,该协议将使其能够加快FEED之前的研究,如果能从欧盟NER-300计划获得资金方面取得进展,有望在2012年下半年进行全面的前端工程设计研究。

著录项

  • 来源
    《Power in Europe》 |2011年第613期|p.24|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号