...
首页> 外文期刊>Power in Europe >Reserve same as for 2011
【24h】

Reserve same as for 2011

机译:与2011年相同

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

As in winter 2011/2012, federal regulator Bundesnetzagentur (BNA) has identified reserve capacity to be called up in case of emergency this winter. "The same units are on the reserve list as for last winter, as set out in the BNA winter report published in May, 2012. The TSOs are responsible for signing them up," a spokeswoman told Platts.The units are Mainz-Wiesbaden 2 (350 MW) Grosskraftwerk Mannheim unit 3 (200 MW), Heizkraftwerk Freimann (160 MW), and in Austria 785 MW of capacity owned by EVN, 150 MW owned by Verbund and 140 MW owned by Wien Energie. Ensdorf unit 3 (286 MW) is removed from the list after operator VSE leased the unit to steel company Saarstahl.
机译:与2011/2012年冬季一样,联邦监管机构Bundesnetzagentur(BNA)已确定要在今年冬季紧急情况下调动储备能力。一位女发言人告诉普氏能源资讯:“ 2012年5月发布的BNA冬季报告中列出了与去年冬天相同的储备金。由TSO负责签约。”这些单位是美因茨-威斯巴登2 (350 MW)Grosskraftwerk Mannheim 3号机组(200 MW),Heizkraftwerk Freimann(160 MW),在奥地利EVN拥有785 MW的产能,Verbund拥有150 MW的产能,Wien Energie拥有140 MW的产能。在运营商VSE将单位Ensdorf 3号机组(286 MW)出租给钢铁公司Saarstahl之后,该清单被删除。

著录项

  • 来源
    《Power in Europe》 |2012年第638期|p.13-14|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号