...
首页> 外文期刊>Power in Europe >ADMIE calls for final Cyclades phase
【24h】

ADMIE calls for final Cyclades phase

机译:ADMIE要求进入最后的基克拉泽斯阶段

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Greek transmission system operator ADMIE has called forrnbids to supply the third and final phase of the Cycladesrninterconnection project, linking Lavrion on the mainlandrnwith the island of Syros.rnIn a July note in the EU Official Journal, the TSO said therncontract, valued around €115 million, involves supply,rninstallation, 10-year warranty and maintenance of one 150-rnKv, 200 MVA three-pole XLPE submarine power cable andrnthree monopolar underground cables plus fibre opticrncables. Completion of the cable must be within 22 monthsrnof award. Bids are due by August 23, 2018.
机译:TSO在7月份的《欧盟官方杂志》上说,希腊传输系统运营商ADMIE要求Forrnbids提供Cycladesrninterconnection项目的第三阶段和最后阶段,该项目将大陆上的Lavrion与锡罗斯岛连接起来。包括一根150 kV,200 MVA的三极XLPE海底电力电缆和三根单极地下电缆以及光纤的供应,安装,十年保修和维护。电缆的完成必须在22个月之内。投标截止日期为2018年8月23日。

著录项

  • 来源
    《Power in Europe》 |2018年第779期|17-18|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号