首页> 外文期刊>Platts Energy in East Europe >Tender to equip Incir hydro project
【24h】

Tender to equip Incir hydro project

机译:招标以装备无花果水电项目

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

IBA Elektrik, a subsidiary of Enerjisa, one of Turkey's leading private power producers, is seeking bids by August 10 to build, test and commission an 80-MW-plus hydropower project at Incir in the southeastern province of Siirt, according to a note published July 10 in the EU Official Journal. The 36-month contract requires the supply of turbines, generators, instrumentation and control systems, switchgear and transformers. The project is to be financed via a hybrid corporate/project finance structure at Enerjisa level, IBA said. "Bidders offering financing alternatives at loan structure terms of Enerjisa will be prioritized in the assessment and will have a distinct advantage," it said.
机译:据发布的一份报告显示,土耳其主要私营电力生产商之一的Enerjisa的子公司IBA Elektrik正在寻求竞标,争取在8月10日之前在东南部Siirt省的Incir建设,测试和调试80兆瓦以上的水电项目。 7月10日在《欧盟官方杂志》上。这份为期36个月的合同要求提供涡轮机,发电机,仪表和控制系统,开关柜和变压器。 IBA表示,该项目将通过Enerjisa级别的公司/项目混合融资结构进行融资。它说:“按照Enerjisa的贷款结构条款提供融资替代方案的投标人将在评估中被优先考虑,并将具有明显的优势。”

著录项

  • 来源
    《Platts Energy in East Europe》 |2013年第269期|117-117|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号