...
首页> 外文期刊>Power in Europe >Helsinki utility Helen to shut coal-fired CHP ahead of schedule in 2023
【24h】

Helsinki utility Helen to shut coal-fired CHP ahead of schedule in 2023

机译:赫尔辛基公用事业海伦在2023年之前提前关闭燃煤CHP

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Helsinki utility Helen said on June 22 it plans to shut its coal-firedHanasaari B combined heat and power plant (CHP) by April 1, 2023.The 220 MWe/430 MWth unit, commissioned in the 1970s, had beenexpected to operate until late 2024.Early closure would reduce the Finnish capital’s emissions by about20%, Helsinki mayor Jan Vapaavuori said.Under the new plans, Hanasaari is to be put into reserve for heatingseason 2022–23, when the new biomass-fired 260 MW Vuosaari plantis to start operating.
机译:赫尔辛基公用事业海伦于6月22日说,它计划关闭其燃煤 Hanasaari B综合发电厂(CHP)于2023年4月1日。 220 MWE / 430 MWTH单位,在20世纪70年代委托 预计将运营直至2024年末。 早期关闭会减少芬兰首都的排放 赫尔辛基市长Jan Vapaavuori表示,20%。 在新的计划下,Hanasaari将放入暖气 2022-23季,当新生物量发射的260兆瓦Vuosaari植物 是开始运作。

著录项

  • 来源
    《Power in Europe》 |2021年第850期|15-15|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号